News & Events / Case Studies

Home News & Events / Case Studies

Aesthetix Introducing Spynel Camera from HGH for.

31-01-2022

Aesthetix introduces advanced surveillance and security syst.

View Details

Fatigue & Stress Management Study for HQ and Sites

17-01-2022

Aesthetix, the world leader in innovation and technological.

View Details

Duqm Petrochemical Sites opt for an ergonomically.

12-05-2020

John Wood Group PLC, one of the biggest front end engineerin.

View Details

Aesthetix moves to “ultramodern facility” in Dubai.

20-03-2020

Aesthetix moves to “ultramodern facility” in Dubai’s Silicon.

View Details

Aesthetix secures deal to install pipe line leak d.

10-12-2019

L&T Hydrocarbon engineering, part of L&T group, a $21 Billio.

View Details

ADNOC’s Al Dabbi’ya central control buildings get.

07-04-2019

Italian engineering giant Maire Tecnimont S.P.A, the project.

View Details

Control Room of ADCO at ZERO Downtime

20-12-2018

20th December, 2018, After several advanced studies and expe.

View Details

Sonatrach’s SP1-HEH-ROB1 Pumping Station to utiliz.

23-12-2017

EPC, China Petroleum Engineering and Construction Corp (CPEC.

View Details

Oman Gas Company 3 Year Maintenance

29-06-2017

29th June, 2017, After careful evaluation, Aesthetix emerged.

View Details

Telecom system integrator

18-05-2016

Aesthetix has been selected as Telecom system integrator of.

View Details

Telecom ring optimization project

16-08-2015

Aesthetix successfully completed the telecom ring optimizati.

View Details

Control Room Ergonomics

10-12-2014

Aesthetix successfully completed the control room ergonomics.

View Details