News & Events / Case Studies

 Home  News & Events / Case Studies

Aesthetix moves to “ultramodern facility” in Dubai’s Silicon Oasis

Aesthetix on Tuesday said it was shifting their operations and staff members from its previous office to an advanced workspace at Dubai Silicon Oasis’s light industrial unit.

The new office is expected to significantly increase operational capacity which is in line with their current expansion strategy.

 The design features various kinds of workspaces, including a new training centre, staging area, panel assembly area and other such collaborative working areas, Aesthetix said.

“We relocated to our new office during the pandemic, without scaling back on plans. It was a tough choice to make considering the circumstances at the time, but it later turned out to be the most optimal decision” says Emil George, General Manager Aesthetix.

Other News Details

May 12, 2020

Duqm Petrochemical Sites opt for an ergonomically sustained work environment studied and designed by Aesthetix

March 20, 2020

Aesthetix moves to “ultramodern facility” in Dubai’s Silicon Oasis

December 10, 2019

Aesthetix secures deal to install pipe line leak detection system at Al Dhafra Petroleum’s Haliba Oil Field

July 15, 2019

Drones Services to Oil and Gas Industries

April 07, 2019

ADNOC’s Al Dabbi’ya central control buildings get ergonomically revamped control stations designed and constructed by Aesthetix

December 20, 2018

Control Room of ADCO at ZERO Downtime

December 23, 2017

Sonatrach’s SP1-HEH-ROB1 Pumping Stationto utilize state of the art telecommunication systems from Aesthetix

June 29, 2017

Oman Gas Company 3 Year Maintenance

May 18, 2016

Telecom system integrator

August 16, 2015

Telecom ring optimization project

December 10, 2014

Control Room Ergonomics